Process steps
1. Neutral position
The conveyor belt transports the eggs to the stunning pins.
2. Egg fixation
The stunning pin injectors will be positioned and locked. The position depends on the egg size.
3. Lower pin punch
First, the bottom stunning pins penetrate the eggshell and connect with the egg fluid.
4. Top pin punch
Then the top stunning pins penetrate the eggshell and connect with the egg fluid. Now the electrical stunning gets started.