Process steps

1. Neutral position

aat stunny process steps 1 neutral position

The conveyor belt transports the eggs to the stunning pins.

2. Egg fixation

Grady broschüre2

The stunning pin injectors will be positioned and locked. The position depends on the egg size.

3. Lower pin punch

Grady broschüre2

First, the bottom stunning pins penetrate the eggshell and connect with the egg fluid.

4. Top pin punch

Grady broschüre2

Then the top stunning pins penetrate the eggshell and connect with the egg fluid. Now the electrical stunning gets started.